New Packaging Facility

Salas O’Brien designed and implemented X-Ray replacement, including a new triple-beam machine and conveyance equipment. We also handled the concept line layout, power and utility design, installation, line integration, and qualification assistance.

The scope of work included labeler replacements for two production lines, including recommendations for roll-style labelers and conveyance equipment to provide the client with the most efficient result possible.

Overall, the project involved performing equipment specifications, concept line layout, power and utility design, equipment procurement, installation, line integration, and qualification assistance.

COMPLETION YEAR

2021

Construction Cost

$1.2 million

Project Partner

Skanska