Seaside High School Athletic Field

Salas O’Brien partnered with the Monterey Unified District to bring their athletic fields to the next level. As part of our electrical design, we incorporated energy-efficient lighting systems illuminating the athletic fields and minimizing energy consumption. In addition, we designed the low-voltage connections with the latest technology to ensure efficient power usage, reducing the facility’s overall carbon footprint.

We installed wireless access points and outdoor PA systems, enabling the use of digital technologies in managing the facility’s operations. These innovations provide convenience and reduce the need for paper-based communications, promoting eco-friendliness.

Our plumbing design incorporated sustainable practices by connecting site utilities, potable water, and sewer to the modular buildings using the latest water and wastewater management technology and synthetic turf for the most long-term and efficient water usage and waste reduction.

Award
2021 APWA Merit Award – Environmental Projects between $5M – $25M

Completion Year

2020

Project Partner

Verde Design Landscape Architects

Construction Cost

$6.4 million

Size

142,000 square feet