Fire Station #4

To expand firefighter training facilities and serve regional community growth, the Windsor Severance Fire Protection District constructed a fourth fire station. This two-story, 16,094-square-foot building is constructed of steel, masonry, and vertical composite siding. It houses eight firefighters and an EMS team and features four apparatus bays and a five-story
training tower.

Salas O’Brien provided structural engineering services for this new fire station. The team used complex design and detailed coordination to address the multiple-gable apparatus bay geometry and achieve the correct roof slope for drainage between the gables. This approach also minimized the number of interior columns within the apparatus bays, resulting in only two columns in the four drive-through bays. The training tower design posed additional challenges. Indoor training opportunities are conducted over three levels, and the exterior rappelling training area required exterior tie-in points on the parapet walls at the roof.

SERVICES

Structural

COMPLETION YEAR

2022

CONSTRUCTION COST

$7 million

PROJECT PARTNERS

Allred & Associates, Elder Construction

SIZE

16,094 square feet

PICTURE COURTESY

Lockner Creative