Lab Headquarters

LabCorp’s headquarters campus added a 123,000-square-foot 3-story addition, with two lab floors and a third-floor penthouse, for cytology and histology lab use. Salas O’Brien provided engineering services to add the needed mechanical and electrical infrastructure for year-round continuous operation of current and future lab system spaces, including de-ionized water, compressed air, and lab waste systems. A hydraulically calculated combined fire sprinkler and standpipe system also protects the facility

We designed the HVAC systems with a steam boiler for humidification, hot water boilers for heating, two 275-ton chillers/cooling towers for cooling, and a central exhaust system that covers laboratory hoods and equipment exhaust. In addition, we customized air handling systems to meet the rigorous laboratory pressurization and ventilation requirements.

Completion Year

2012

Size

123,000 square feet

Construction Cost

$21 million