Giga-scale campus on an expedited timeline
Near Abilene, TX, USA
Gigawatt Data Center Campus
Salas O’Brien and Kiewit worked together on a large-scale development to design and deliver a large data center campus (with 2.1 GW IT load) consisting of single-story buildings featuring ultra-high-density, liquid-cooled racks. We provided mechanical, electrical, plumbing, fire protection, security, and computational fluid dynamics (CFD) engineering. The campus included areas with varying rack densities, requiring careful coordination with the client’s infrastructure strategy to align construction phasing with planned capacity deployment. Due to the accelerated schedule, portions of the design packages were broken out separately and issued early to keep the construction schedule on track.
Given the project’s scale and accelerated schedule, no single manufacturer could meet the demand for equipment. The team worked closely with Kiewit and VDC’s procurement group to specify and allocate a diverse mix of products across the campus, managing material availability and timely delivery. In parallel, our team coordinated with the power generation vendor to evaluate utility impacts, protective settings, heat rejection impacts, and grounding system considerations associated with the campus’s extensive on-site power generation strategy.
2028 (expected)
3.7 million square feet
1,200 acres
11 Buildings