Projects
Reducing operating costs while doubling production
POCATELLO, ID, USA
Barley Clean Line Upgrades
Salas O’Brien provided expert mechanical and structural engineering services for the barley clean line upgrades at a leading malting facility, supporting the client’s goal to double production capacity and streamline operations. Our team engineered and implemented upgrades two barley clean lines, each with a capacity of 50 metric tons per hour, supporting robust infrastructure integration.
By leveraging advanced modeling and detailed design, we optimized the equipment layout, minimized operational disruptions, and enhanced system reliability. These upgrades enabled the client to increase throughput by 100%, significantly reducing operating costs and inventory levels. Our team’s collaborative approach and technical expertise secured the project’s success, delivering measurable value and supporting the client’s long-term growth objectives. Our work laid the foundation for efficient, high-capacity processing that meets current and future industry demands.
2024
$120,000
Two 50 MT/hr barley clean lines