CLIENT

Kaiser Permanente

DESCRIPTION

San Marcos Medical Center

SERVICES

Electrical

LOCATION

San Marcos, California

YEAR

Estimated in 2023

CONSTRUCTION COST

$526 million

PROJECT PARTNER

CO Architects

SIZE

455,359 square feet

Electrical Expertise for Microgrid Planning at New Hospital

Our team was proud to partner with Kaiser Permanente to provide electrical engineering for their first new hospital developed with a microgrid. We provided electrical design for their new seven-story medical patient tower and 28,000-square-foot central utility plant, including 1.75 megawatts of Bloom energy servers for on-site power generation and provision for photovoltaic and battery connection.

We designed the hospital with low-voltage DC lighting systems with Class 2 wiring, which eliminated the need for 5.6 miles of 3/4-inch conduit and 4.5 miles of metal-clad cables. The systems were the first-ever reviewed and approved by the California Department of Health Care Access and Information to use DC lighting on the patient care floors. In addition, the project is pursuing LEED Platinum certification.