Their challenge

As some of the most energy-consuming facilities in the world, NECs require design which optimizes space and environmental control to keep equipment within critical temperature/humidity range. Salas O’Brien played a big role in keeping this particular NEC in Colorado Springs running smoothly.

Our solution

Our team provided architectural and engineering design as well as construction administration services for the reclamation of 5,000 square feet of NEC raised floor space, 3,000 square feet of non-raised floor space, and infrastructure support spaces for the existing facility. The project also included the development of a master plan for reclaiming 18,000 square feet of raised floor space and infrastructure support spaces. Throughout this project, Salas O’Brien supplied electrical, mechanical, plumbing, structural, civil, fire alarm and monitoring, fire suppression, and architectural design services.