CLIENT

Colorado School of Mines

DESCRIPTION

CoorsTek Center for Applied Science
and Engineering

SERVICES

Acoustics
Technology Design

LOCATION

Golden, CO

YEAR

2018

CONSTRUCTION COST

$39 million

PROJECT PARTNERS

Anderson Mason Dale
Bohlin Cywinski Jackson

SIZE

95,000 square feet

Audiovisual Design Optimizes Cross-Disciplinary Learning

The CoorsTek Center for Applied Science and Engineering (CASE) at Colorado School of Mines is a top-of-the-line facility that contains both the Physics Department and the College of Applied Sciences and Engineering. The facility has versatile laboratory space and technologically advanced active learning classrooms, allowing essential collaboration in science and engineering.

Our team provided acoustics and audiovisual system design to ensure the professors leverage the cross-disciplinary strengths within science and engineering. The design considered vibration-sensitive laboratory equipment and integrated multiple displays and projectors into one system, ensuring that every student has an optimal learning experience.