Contributors: Santiago Rodriguez

A design team on a residential project built its original design around the local energy code’s prescriptive path, which required including energy recovery ventilators (ERVs) in the mechanical systems. Once the design had taken shape, the cost of that equipment prompted a harder question: could an energy model demonstrate compliance through the performance path and make the ERVs unnecessary?

The model’s answer was no. The building does not meet the 20% better-than-code target, so the savings must come from other sources. One of the planned changes is to replace electric domestic hot water heaters with high-efficiency heat pump systems, a modification the team had previously thought was settled.

This project followed a typical approach. Usually, energy modeling is done after the design phase, once the envelope, glazing, HVAC systems, controls, and electrical infrastructure are set. At that stage, any discrepancies between the design and compliance requirements must be addressed through redesign and additional coordination. Owners and design teams must choose whether to determine how a project will meet compliance early, influencing the design, or to find out later, when the compliance requirements might restrict their options.

Why IECC 2024 raises the stakes

Energy codes have grown far more complex over the past decade. What was once a fairly routine exercise now involves requirements for controls, metering, envelope performance, commissioning, and renewable energy systems, and each of those touches a different member of the project team. As IECC 2024 adoption accelerates across the country, more projects are meeting that complexity for the first time, and many are meeting it late.

Two requirements tend to catch teams off guard: the new energy monitoring requirements and the addition of on-site renewable energy. Both carry first-cost implications and affect the mechanical and electrical systems, making them difficult to absorb once those systems are in place.

The energy monitoring requirement involves metering and controls that track whole-building energy use and major end uses. The on-site renewable energy provision requires a minimum amount of renewable energy generation, typically from a photovoltaic system, and is generally triggered for new buildings or qualifying additions based on conditioned floor area. A team that learns about either one during design development has far fewer options than a team that learns about it during predesign.

This is why energy modeling is increasingly integrated earlier in the design process. When used early, a model shifts the role from a final checklist to a tool that helps evaluate tradeoffs during the building’s development.

Choosing a compliance pathway early

Project teams assessing performance-based compliance frequently compare the IECC 2024 with the Energy Cost Budget (ECB) method outlined in ASHRAE 90.1-2022. Most teams prefer the ECB approach because it offers greater design flexibility while maintaining compliance. The IECC 2024 Performance path is chosen when local jurisdictions do not accept ASHRAE 90.1 as an alternative, and reviewer’s familiarity with IECC documentation can influence the choice in certain markets.

The residential project illustrates how the timing of that decision is just as important as the decision itself. A performance path offers flexibility, but only if the building’s design provides sufficient headroom to meet the savings target.

A team that arrives late in the performance path, after the envelope and systems are already fixed, might discover that the model has limited options and that the desired trade-off is unattainable. Conversely, a team exploring the same path during schematic design can modify the building early on to realize those savings on their own terms.

Once a pathway is selected, the project should be designed and documented consistently according to that framework. Switching directions later increases costs, complicates the process, and delays the schedule, so making an early decision helps safeguard the project’s subsequent stages.

What the model can answer during schematic design

Schematic design is the stage where energy modeling can have the most impact because it addresses questions that are still cost-effective to modify. The choices made at this point significantly affect both the building’s performance and the project’s overall cost. Early modeling provides the team with essential information to optimize energy efficiency before these decisions become fixed in drawings and specifications.

During schematic design, the model should help answer practical questions such as:

  • What insulation levels and envelope assemblies provide the best balance of energy savings and cost?
  • How does window-to-wall ratio, glazing performance, orientation, and shading affect energy performance and thermal comfort?
  • Which HVAC system type and efficiency levels best support the project’s energy target?
  • Can the project demonstrate performance-path compliance without ERVs?

The benefits are especially significant for projects with extensive glazing, ambitious sustainability targets, unique building functions, or specific performance goals. In such cases, minor design adjustments can notably influence compliance outcomes. Early modeling for these projects also helps meet broader goals, such as LEED certification, as the same analysis can guide both code compliance and overall performance strategies.

What owners need to understand

Owners often believe that energy code compliance is solely the responsibility of the design team. In reality, the project’s chosen pathway can impact decisions regarding:

  • Renewable energy systems
  • Metering
  • Testing protocols
  • Controls infrastructure

Each of these factors influences the initial cost and the building’s long-term operation. Early awareness allows an owner to consider these implications against budget and project priorities, whereas late awareness often means responding to a design that has already progressed.

The residential example illustrates the same idea in monetary terms. When a requirement is identified after budgets are established, it leads to negotiations over potential cuts or additions. As each phase of design progresses, the available options become increasingly limited.

Overcoming the barriers to starting early

Starting a model before the design is finalized can seem premature. And with tight budgets, compressed schedules, and teams wanting a more complete design before analysis, it’s challenging. But the value of a model is greatest before the design is fully developed.

Waiting for certainty means delaying until minimal changes are possible. A small investment in early analysis usually costs less than the costly redesign it prevents.

Coordination presents another challenge. The architect, mechanical and electrical engineers, and the modeler all must work together to facilitate compliance, and the pathway remains viable only if everyone designs and documents with it in mind. Teams that involve the modeler early in the process and maintain an up-to-date model as the design develops are more likely to preserve their selected pathway through construction documents.

How can Salas O’Brien help?

If your project is weighing IECC 2024 compliance, ASHRAE 90.1 performance pathways, or LEED goals, the right time to talk is before the design takes shape. Our team brings more than 50 years of combined experience in energy modeling and building performance consulting, and it includes building physics specialists, mechanical engineers, and architects, which gives us a well-rounded view of how a model’s results translate into design decisions.

We have performed energy simulations for:

  • Small office buildings
  • Data centers
  • Manufacturing facilities
  • Residential towers
  • Warehouses
  • Laboratories
  • Schools

These represent a few examples among many other project types. As GBCI LEED reviewers, we also review energy models regularly and stay current with the industry’s best practices.

We work alongside owners, architects, and engineers to choose a compliance pathway early and to carry it through the life of the project. Reach out to discuss your project with one of our experts. Contact us at [email protected]

For media inquiries on this article, reach out to [email protected].

Contributors
Santiago Rodriguez

Santiago Rodriguez

Santiago Rodriguez is an energy modeling and energy efficiency specialist who has helped improve building performance by implementing energy efficiency measures across projects ranging from office buildings to high-rise buildings and large manufacturing facilities. He performs energy modeling and daylight simulations and serves as a third-party verifier for LEED certification energy modeling reviews. He has contributed as an energy modeler to more than 150 projects, including LEED certification, IECC code compliance, and standalone energy studies. Santiago serves as Energy Modeling Team Manager & Senior Energy HVAC Specialist at Salas O’Brien. Contact him at [email protected]