Case Study

Santa Clara Valley Water District

South Campus Generator Replacement

Salas O’Brien provided electrical engineering for the Santa Clara Valley Water District. The scope of work included the design of a new generator and switch gear to comply with the Bay Area Air Quality Management District standards.

Our engineers designed the replacement of the transfer switch and provided proper space design for the new generator location.

During this process, Salas O’Brien prepared all required construction drawings and specifications necessary to obtain all applicable permits. All documents required to advertise for construction bidding were also provided.

Highlights

Location:
San Jose, California

Construction Cost:
$1,000,000

Discipline:
Electrical Engineering

footer-logos

CONTACT US
Thank You. We will contact you as soon as possible.
Leave your contact info below and we'll get right back to you.
Let's talk!
You will hear from us soon.
Thank you!